Completed in October 2019, the Candlewood Suites is the first hotel using American produced Cross-Laminated Timber (SmartLam, Columbia Falls, MT), incorporating CLT for the hotel floors, roof, exterior walls, shaft walls and selected interior walls. The prefabricated massive timber panels enabled for a time efficient workflow by shipping the durable wood products directly from the manufacturer to the site. Off-site manufacturing and on-site waste were reduced, and the timber structure was completed 37% faster than a conventional light gauge metal (LGM) framing, used on other hotels with the same scale and scope. The CLT installation started in late October 2018 and was already completed by a 11-man crew (7 of which were laymen and trained on site) in February 2019.
The Candlewood Suites Hotel serves as a five-storey CLT statement that represents the new self-conception of massive timber, as a prefabricated, environmentally friendly and time-saving building method.